Schemes of 11th Five Year Plan (2007-12)
SCHEME CODE
|
Name of the Scheme
|
Name of attached faculty/personnel
|
5 yr Plan Budget (lakhs)
|
Objective with deliverables
|
???
|
(A)
|
Continuing / Ongoing Schemes
| ||||
C01
|
Teaching Programme
|
IP Singh
|
300
|
To train the students in various fields of pharmaceutical sciences
To develop the inter-disciplinary skills so that the graduates interface with various pharmaceutical industries in relation to the requirement of the manpower in this field
|
How many students placed in industry last five year?
|
C02
|
System Biology
|
N Roy
|
380
|
To concentrate on Research towards drug target discovery of leishmaniasis, malaria, diabetes and related lifestyle disease and to provide training of NIPER students (both masters and Ph.D.)
|
No money allocated in 20007-08 & 10-11
where it is diverted? |
C03
|
Invitro/ Alternative Method of Screening
|
KB Tikoo
|
475
|
To create various in-vitro pharmacological screening assay facility
|
How many assay developed?
How many compound screened?
How many sample from industry screened?
|
C04
|
Daibeties Complications
|
SS Sharma
|
550
|
To drug target identification with special reference to research on insulin resistant diabetes.
|
How many target discovered?
What is the out come?
|
C05
|
Pharma Parasitology/Virology/Infection Laboratory
|
PP Singh
|
913
|
To expand and modernize the existing small base of pharmaceutical parasitological research and education. Creat a PIII Laboratory for parasitological research
|
Is P-III laboratory functional?
Is the equipments operational?
Physical tour of the facility to verify the progress
|
C06
|
Leads Moleculars for TB, Malaria and Ieishamania
|
AK Chakraborty
|
515
|
Rational design of heterocyclic molecules (NCEs)as potential antiparacytic inhibitors.
Synthesis of designed heterocyclic compounds(NCEs)
Bio‐evaluation studies for discovery of novel anti-paracytic agents
|
How many molucule developed?
How many molecule send for bioassay?
Is it true a new biological laboratory developed in medicinal chemistry department? Is it functional?
|
C07
|
Pharma Grid
|
P Garg
|
1106
|
Establish state-of-the-art computing facility to the faculty and students of the Institute and others by housing leading-edge computing systems
|
How many jobs done in the system and for what purpose?
|
C08
|
Pharamaco-informatics
|
PV Bharatham
|
325
|
Establish a grid based computational facility for the benefit of computational studies of Drugs and train students
|
How many computational studies of Drugs done so far?
|
C09
|
Chiral Drugs/bio-Chemo Enzymatic-Transfermation
|
UC Banerjee
|
178
|
Biotransformation of enantiomerically pure drugs as a replacement for racemic forms some of which are currently in clinical use
|
Any Chiral molecule developed?
Why mid term review committee recommended project to be shelved
|
C10
|
Pharmacy Heritage
|
Director
|
145
|
To start audit course for all the students in NIPER in Ancient History Sacred medicine, Drugs and Immune system of Medicine
|
No course started objectives of a project funded in national interest, failed.
|
C11
|
Nanotechnology & Drug Delivery System
|
N Kumar
|
525
|
Develop of efficacious Nanomedicines
|
Any Medicine developed ?
|
C12
|
Business Development Group
|
A. Vig
|
175
|
-To increase interaction with niche area clients, both within India and abroad
|
No such group set up at NIPER, Mohali till date. All objectives of a project funded in national interest, failed Money also asked for the same project in N09, surprising
|
C13
|
Reference Standard Development
|
S Singh
|
200
|
Development reference standards for Indian Pharmacopoeial Commission (IPC).
|
How many reference Standard Developed?
Money used in trading
|
C14
|
Advance Centre For Traditional Medicine
|
KK Bhutani
|
639
|
Develop cost effective medications and biological agents from sustainable medicinal plant resources
|
How many types of equipment are purchased? How many hour of running time logged?
|
C15
|
Impurity Profiling Facility
|
S Singh
|
102
|
Provide synthesized impurities to SME and global pharma industry
|
How many Impurity Standard Developed?
Money used in trading?
|
C16
|
Standardization of Herbal Products
|
KK Bhutani
|
223
|
To expand and modernize the existing small base of herbal product and make herbal product for clinical trial
|
Green houses are empty herbs are growing where?
|
C17
|
Pharamacological & Toxicological Screening Facilities
|
SS Sharma
|
148
|
Establish cell-based and animal based assays for lead evaluation, optimisation and pre-clinical evaluation and training
|
How many assay developed?
How many compound screened?
How many sample from industry screened?
|
C18
|
National Bio Availability centre
|
S Singh
|
257
|
To expand the existing facility
|
No work for the existing center for last six years why extension? Money also asked for the same project in N06, surprising
|
C19
|
Technology Development
|
A. Vig
|
569
|
To provide training in scale up pilot plant for Bio technology and process chemistry
Up gradation of TDC to meet Schedule “M” and WHO standards
|
No training provided to students used to rent Ranbaxy lab in lower rate CAG objected, para stands.
|
C20
|
Library/Electronic Journals
|
KP Kartha
|
550
|
Procurement of books, journals & abstracts for the library
|
Why money from N-17 diverted to purchase Sci-finder, at an annual recurring expense of about Rs.27 lacs every year, though same was neither proposed nor approved under the project.
|
C21
|
CIL Instruments
|
AK Chakraborty
|
750
|
Central instrumental support for running in-house Institute schemes, testing of samples of universities, other Institutions and Pharma Ind
|
How many types of equipment are purchased? How many hour of running time logged?
|
C22
|
Project Manpower Expenditure
|
Registrar
|
475
|
Project stopped due to lack of manpower, where the money gone?
| |
(B)
|
Infrastructure Development and New Schemes
| ||||
N01
|
Boys Hostel
|
Executive Engineer
|
500
|
To accommodate more no. of students
|
Functional
|
N02
|
Swimming Pool
|
Executive Engineer
|
125
|
To set up facility for the health of student & staff
|
Non functional till date All objectives of a project funded in national interest, failed
|
N03
|
Shopping centre
|
Executive Engineer
|
5
|
To set up facility with in the campus
|
Functional
|
N04
|
Community Centre
|
Executive Engineer
|
45
|
To set up the facility for staff of Institute
| |
N05
|
Auditorium
|
Executive Engineer
|
550
|
To accommodate more no. of person during workshops/seminars/convocation & institutional functions
|
No such building till date. All objectives of a project funded in national interest, failed
|
N06
|
Extension of Bio-availability Centre
|
Executive Engineer
|
44
|
No work for the existing center for last six years why extension?
| |
N07
|
Health Centre
|
Executive Engineer
|
57
|
To take care the health of students
|
A gynecologist recruited without advertisement for 600 male student
|
N08
|
Type II-V Houses
|
Executive Engineer
|
455
|
To accommodate more staff
|
Existing building are not occupied why build new building? CAG also objected para stands
|
N09
|
Provision of additional bridge & gate
|
Executive Engineer
|
286
|
To expand the existing facility
|
Done
|
N10
|
Earth filling & Land Scaping
|
Executive Engineer
|
128
|
To claim more land
|
Area of land developed
|
N11
|
Furniture & Air-conditioning etc.
|
Executive Engineer
|
400
|
The meet the furniture & air-conditioning requirements of above infrastructure
|
Where are the furniture located? Any physical verification done?
|
N12
|
Herbal Preservation Setup
|
KK Bhutani
|
85
|
Recommended to be shelved
| |
N13
|
Setting Up of Dosage form Pilot Plant
|
AK Bansal
|
541
|
To setup dosage form pilot plant
|
Is it completed? All objectives of a project funded in national interest, failed.
|
N14
|
New specialization in Pharma Mgt.
|
A. Sharma,
|
160
|
To train the students in management of drug discovery/development institutions will yield better results and minimize the losses.
The mandate of NIPER will be meaningfully fulfilled by providing specifically trained human resources
|
No such specialization introduced in MBA Department till date. All objectives of a project funded in national interest, failed.
|
N15
|
Research in Pharm Vigilance & Pharmaco economies
|
P Tiwari
|
250
|
To train in strong pharmaco-vigilance activity for ensuring safer use of medicines
|
What research conducted? How many equipments purchased? Why those equipments transferred without using?
|
N16
|
Clinical Research Training
|
P Tiwari
|
250
|
To train the students in conducting clinical trials
|
How many clinical trials conducted?
How many students trained?
|
N17
|
Intellectual Prop. Right
|
P. Bansal
|
225
|
Human resource development in IPRs to meet the demands and challenges of Pharma /academic institutes and Industry
|
No such department set up at NIPER till date. All objectives of a project funded in national interest, failed.
|
N18
|
Drug for Most neglected diseases
|
R Jain
|
1583
|
To develop a state of the art teaching and research laboratory, which would conduct research in drug discovery areas as, mentioned above.
To generate technically qualified human resources for future medicinal chemistry and Pharmaceutical industry of India.
To explore various modern techniques for drug discovery and development.
To carry out consultancy assignments relevant to above-mentioned areas.
|
How many students trained?
How many consultancy project done?
What modern technique explored?
How money utilized in swimming pool?
|
N19
|
Cerebral ischaemia/MRI
|
SS Sharma
|
500
|
Recommended to be shelved
|
No comments:
Post a Comment