Monday, 19 December 2011

Unused facility @NIPER pertaining to Natural products


Achievement of officiating director in 11th five year plan projects pertaining to natural products. 

In 11th five year plan two projects were proposed/ taken up by officiating director NIPER.  A) Advanced Centre for Traditional Medicine (C-1409): Budget allocated 223 lakhs B) Standardization of Herbal Products (C-1609): Budget allocated 83 lakhs

Following objectives were set by officiating director himself for the scheme/projects

A) Advanced Centre for Traditional Medicine (C-1409): 

Ø  To lay down standards and effective quality controls on the herbal medicinal products.
Ø  To create databases for identification and authentication of materials with well defined botanical and phyto-chemical characteristics.
Ø  To evolve scientific cultivation practices of few pharmaceutical important medicinal plants/herbs by monitoring active principles for reference purposes and commercial exploitations.
Ø  To create libraries of marker/characterizing constituents for positive chemical identification of material through chemo-profiling.
Ø  To create quantitative standards for extracts and their formulations through chemo an bio-profiling.
Ø  To create standard protocols for establishing purity of materials, identification of adulterants, substitutes, pathogenic bacteria and fungi, heavy metals and pesticide residues.
Ø  To develop dosage forms of the herbal products their stability studies.
Ø  To develop bioavailability protocols for herbal medicinal products with the help of biomarkers.
Ø  To explore the use of natural products in the disease areas of anti-diabetics, anti-infective with emphasis on tropical diseases immuno-modulation and inflammation, gynaecology and endocrine dysfunctions and anti-cancer drugs with apoptotic molecular basis.
Ø  Finally to conduct clinical trials of the scientifically developed formulations and natural products based drugs to validate the traditional claims. 


B) Standardization of Herbal Products (C-1609): 

Ø  To standardize single herbal drugs and formulations. 




Four state of the art Green house were build with automatic sprinkler system and climate control for growing sustainable medicinal plant resources.















In reality few weeds are growing inside the green house.













A  green house for cactus is also build with modern fixtures. Some fixtures are stolen but not reported to police.









Whatever is growing inside in not cactus. 











Achievement so far (till mid term review), 

➢ Lab construction, establishment and procurement of instruments viz. Super-critical Fluid Extraction System (SCFEs), HPTLC, Lyophlizer, GCMS system etc. has been made.
➢ In the month of August 2009, a website was launched by Prof. K.K Bhutani giving brief description of work done by Natural Products Research Group at the Department of Natural Products along with downloadable department’s profile. 



Like objectives shade is also empty, nobody knows why it was build



Super-critical Fluid Extraction System (SCFEs), a costly state of the art system is gathering dust since installation.

Where is scientifically developed formulations?? 

What about clinical trial???



The only natural product for which NIPER could have demanded credit, came to market due to efforts of IPR cell. 

Vaid’s formula tops in asthma, cough research at PGI - Indian Express


Dr. Parikshit Bansal faculty worked hard for patenting, developing and marketing it, is now facing wrath of officiating Director, HOD Natural Products (for indulging into his domain????). 


He will also face fact finding committee soon, his job might be terminated for launching a natural product at market, thanks to Officiating Director, HOD Natural Products.

Saturday, 17 December 2011

Anna Hazare is the CNN-IBN 'Indian Of The Year 2011' - India News - IBNLive


Social activist Anna Hazare was named 'Indian Of The Year' for the year 2011 for bringing the grave issue of corruption to the forefront in the country.
"I don't have any money in the bank but I have taken six cabinet wickets. Bring Lokpal by December 22, I will call off fast. Government has nothing to fear from me, it should only fear the public," Anna Hazare said after receiving the award.

Bootlickers may call him "toxin for our system, Bhasmasur”, rest of the country knows the truth.

Friday, 16 December 2011

Hat's off to Madihur Rehman Suhaib, Associate professor AMU

AMU has an Anti-Corruption Forum, majority of the members are faculties; they function as Watchdog and take responsibility to clean up and restore academic standerd of the University.

I wonder do they have bootlickers too? Who consider faculties like Rehman Suhaib as toxin for the system?


Wednesday, 14 December 2011

How 11th five year plan money utilized @NIPER, an external committee report

Prominent points

1. There has been no significant progress in respected of following 3 projects. It is suggested that these schemes may be differed from the 11th Five year plan and money saved could be utilized for completing other schemes where the budgeted amount were under estimated.

a. Impurity profiling and stability testing ( Ex-dean used the money of the project for trading. In Financial year 1011-12 again money is allocated)

b. Earth filling and landscaping

c. Cerebral Ischemia / MRI

3. As such total expenditure of Rs. 168.53 crore exceeds the plan budget by Rs. 11.64 crore (mainly due to construction cost escalation)

4. Budgeted estimate for infrastructural projects involving civil work is grossly underestimated.

5. Since most of the buildings like Boys hostel, Community center is yet to be completed, the expenditure of Rs 181 lacs incurred during last three year needs to be looked into.  (This is the expense for furniture for new buildings which was not build at that time and furnitures were untraceable).

6. Urgent need of strengthening the finance and accounts department (money misappropriation?)

7.   There should be another Mid term review  of 11th Five year plan in mar-Apr 2011 (not Done)